   PROJECT NAME : Technical Due Diligence on Phetchaburi Oil Terminal
Owner : The Bangchak Petroleum Public Co., Ltd.
Client : The Bangchak Petroleum Public Co., Ltd.
Location : Phetchaburi pvovince
Period of Services : 2009
Project Cost : Approx. 4,000 Million Baht
Scope of Services and Description of Duties :

The Consultant has been appointed by the Bangchak Petroleum Public Company Limited to conduct the technical due diligence on the Phetchaburi Oil Terminal which consisting mainly of:

(1) Storage Tanks   :   16 Tanks (5000,000 m3 capacity)
(2) Truck Loading System   :   16 bays
(3) Sea Berth   :   30,000 & 5,000 DWT tanker
(4) Submission Pipelines   :   3 x 16, 6.5 km each
(5) Marine Loading arms   :   16 Tanks (5000,000 m3 capacity)
(6) Utilities and Infrastructures   :

The scope of service included the followings:

  • Reviewed existing terminal design for conformance with international standards
  • Evaluated remaining life of the terminal
  • Evaluated condition of terminal and cost or repair
  • Reviewed conformance with regulation
  • Assed risk on change of regulation in future
  • Recommended improvement
  • Estimated construction cost of new terminal
  • Feasibility study on increase of discharge capacity