October 18, 2018
 POWER ENGINEERING
 OIL & GAS INDUSTRIES
 INDUSTRIAL FACILITIES
 PORT & COASTAL WORKS
 BUILDINGS
 PIPING
 ENERGY CONSERVATION
   PROJECT NAME : Upgrading Works at Sriracha Oil Terminal
Owner : Petroleum Authority of Thailand (PTT)
Client : DORSCH Consult (Germany)
Location : Sriracha Oil Terminal, Sriracha district, Chonburi province, Thailand
Period of Services : 1992 - 1993
Project Cost : Approx. 400 Million Baht
Scope of Services and Description of Duties :

In association with DORSCH Consult, ATT provided detailed engineering design, cost estimation, tender document preparation and construction supervision of the following marine facilities for PTT Oil Terminal in Sriracha district:

  • Seaberth for 20,000 to 80,000 DWT Tankers
    • 16.5 x 28.5 m., two-storey operation platform to accommodate 6 loading arms, office, 24", 18" and 8" submarine pipelines, pig launcher, fire protection system, ship access tower, etc.
    • 100 and 150 ton mooring dolphins with quick released hooks
    • Breasting dolphins
    • 800 m. of 24", 18" and 8" submarine pipelines
    • 1.20 km of 24", 18" and 8" onshore pipelines through ESSO Refinery area and PTT Oil Terminal area
    • Cathodic protection for piling system and steel structures
  • Jetty for 1,000 to 6,000 DWT Tankers
    • 9 x 14 m. operation platform to accommodate 6 loading arms and piping system
    • 100 ton and 60 ton mooring dolphins
    • Strengthen 800 m. of access bridge
    • Cathodic protection system
    • Fire protection system

000191

TOP