October 18, 2018
 POWER ENGINEERING
 OIL & GAS INDUSTRIES
 INDUSTRIAL FACILITIES
 PORT & COASTAL WORKS
 BUILDINGS
 PIPING
 ENERGY CONSERVATION
PORT & COASTAL WORKS

Maritime navigation is an environment-friendly and cost-effective mode of transport. During the past decade, the demand for port facilities and services for large cargo and container vessel has been rapidly increasing. Therefore, for most countries, including Thailand, development and maintaining port and waterway infrastructures is essential for their economic development.

To meet there challenges, we provide our clients with innovative, practical, cost-effective and efficient solutions associated with port and coastal projects, such as port, jetty, seaberth, breakwater, dredging, land reclamation and beach protection. We also provide services on the site investigation, such as hydrographic survey, wave and current measurement, sediment transport measurement, etc.

Projects :
  1. Study and design for Tsunami Protection Structure Project Details..
  2. Survey and Detailed Design for Construction of Ban Nakluea Port Trang Province Details..
  3. Leamchabang Port Phase 3 Details..
  4. Damage Investigation IRPC Jetty Wharf No.1 to No.8 Details..
  5. Feasibility of Thai Oil Jetty Expansion Details..
  6. Structural Reliability Investigation and Rehabilitative Design of Shell Oil Loading Portss Details..
  7. Jetty No.1 Khao Bo Ya Oil and Gas Details..
  8. Engineering Consultancy Services of Area C0 Leamchabang Chonburi Details..
  9. Feasibility Study and Detailed Design for Trang Port Details..
  10. Feasibility Study for Breakwater Rayong Details..
  11. Designated Area for Sustainable Tourism Samer Islands and Connected Zone Details..
  12. Pakbra Deep Sea Port Details..
  13. Feasibility Study and Detailed Design for PP Island Torist Pier Details..
  14. Survey and Design for Improvement of Plot Station Details..
  15. Architectural and Engineering Detailed Design of Pattaya-Chomtien and Cha-am Beach Details..
  16. Ao Chalong - Ao Por Tourist Pier Details..
  17. Leamchabang Port Phase 2 Details..
  18. Pattaya Rehabilitation Details..
  19. Feasibility Study of Tak Bai Jetties Details..
  20. Detailed Design of Thilawa Oil Jetty, Yangon Division, Myanmar Details..
TOP

000190

TOP