PROJECT NAME : Energy Audit of Thai Lube Base Oil Refinery Plant
Owner : Thai Lube Base Public Co., Ltd.
Client : Thai Lube Base Public Co., Ltd.
Location : Sriracha District, Chonburi Province, Thailand
Period of Services : 1999
Project Cost : NA
Scope of Services and Description of Duties :
The main products of Thai Lube Base Refinery Plant is lube oil, bitumen and other by-products. The capacity of the plant in 1998 was 146,875 ton of lube base, 311,750 ton of bitumen and 181,130 ton of by-products. From this process, the expenditure on electricity is about 148.7 million baht per year.
For the purpose of efficient electrical consuming of the Plant, ATT was awarded a contract to perform the energy audit of the plant. The services include the following:
• Examine the present energy consumed,
• Electricity,
• Oil and gas
• Steam
• Evaluate on the result,
• Recommend on the practical means to save the energy together with the cost estimation.