PROJECT NAME : Port and Facilities Design for Trubaindo Coal Mining
Owner : Banpu
Client : Banpu
Location : East Kalimantan, Indonesia.
Period of Services : 2004 – 2005
Project Cost : Approx. 2,500 Million Baht
Scope of Services and Description of Duties :
Banpu has got a concession to produce coal from Trubaindo Coal Mining. The coal mine site is at MaraLawa, East Kalimantan, Indonesia. Coal will be transported by trucks approximately 40 km to a coal terminal near Mahakam River. Coal will be crushed and stocked at that site. After that coal will be loaded to barges 5,000-8,000 DWT and go to the sea.
ATT provided detailed engineering design, cost estimation, tender document preparation and construction supervision of the following facilities:
• Coal loading port and Supporting port design
• Coal Port
• General Port
• Diesel Oil Port
• Waiting Barge Dolphins
• River Bank Protection
• Port Lighting
• Civil and structural design for coal handing facilities
• Earthwork
• Internal Road
• Drainage System and Setting Pond
• Buildings (Office, Laboratory, Workshop and Warehouse)
• Generator House
• Diesel Storage and Supply System
• Water Supply System
• Electrical Supply and Lighting