PROJECT NAME : Bang Poo Steam Pipeline Design
Owner : GEC ALSTHOM Power Generation Ltd. (France)
Client : GEC ALSTHOM Power Generation Ltd. (France)
Location : Bang Poo Industrial Estate, Samuthprakarn Province, Thailand
Period of Services : 1998
Project Cost : Approx. 4,000 Million Baht
Scope of Services and Description of Duties :
Bang Poo Combined Cycle Cogeneration Power Plant Project is a 110 MW SPP Project utilizing natural gas from PTT pipeline. The electricity is sold to the users in the area and the rest to EGAT. The power plant also produces steam which will be supplied to ASIA FIBRE and SIAM OCCI.
ATT provided engineering design service for the steam pipeline network to GEC ALSTHOM Power Generation (Thailand) Ltd., the construction contractor for the power plant. The services are summarized as follows:
• General arrangement drawings
• Civil guide drawings
• Piping arrangement drawings (for lines inside buildings)
• Pipe stress analysis
• Large bore isometric drawings
• Outdoor piping detailed design drawings
• Piping material management document
• Pipe support drawings