A Member of TEAM GROUP

Home PORT & COASTAL WORKS Detail Design Jetty No.1 Khao Bo-Ya Oil and Gas Terminal

PROJECT NAME : Detail Design Jetty No.1 Khao Bo-Ya Oil and Gas Terminal

 

Owner : PTT Public Co., Ltd.

Client : PTT Public Co., Ltd.

Location :  Sriracha District, Chonburi Province

Period of Services :  2007

Project Cost :  Approx. 70 Million Baht

Scope of Services and Description of Duties :

 

PTT Jetty No.1 at Khao Bo-Ya Oil and Gas Terminal was designed to berth 100,000 DWT tankers. Currently there are requirements to berth smaller tankers 2,000-5,000 DWT. Small ships can not berth because the space between dolphins are too large. PTT requested ATT to conduct detailed design.

 

ATT provided the following services for the project:

 

• Site investigation, such bathymetric survey, geotechnical investigation

• Detailed engineering design of jetty platform, breasting and mooring dolphins to berth 2,000- 5,000 DWT tanker.

• Detail design of loading arm including pipeline for product loading.

• Preparation of tender document, specification, bill of quantity.