PROJECT NAME : Supervisory Services for the Construction of the 230 kV Underground Transmission Line between Bangkapi and Chidlom Terminal Stations and Construction of Chidlom Terminal Station Terminal Stations Project
Owner : Metropolitan Electricity of Thailand (MEA)
Client : Metropolitan Electricity of Thailand (MEA)
Location : Bangkok, Thailand
Period of Services : 2005 – Present
Project Cost : Approx. 10,000 Million Baht
Scope of Services and Description of Duties :
After the Consortium of Thai Consultants and international specialists for tunnel design, HV cable accommodation and substation design, ATT, Tokyo Electric Power Services Co. (TEPSCO), Electricite’ de France (EDF) and TEAM Consulting Engineering and Management Co., Ltd. (TEAM) studies and detailed design the new MEA tunnel for cable about 2.6 meters inside diameter to be constructed mainly beneath the right of way of a Sansab canal
ATT was selected by MEA to act on behalf MEA in supervising the construction work. The supervision contains of all work mentioned in the contract documents for the construction, drawings, specifications and special provisions, etc.
Consortium of Thai Consultants and international specialists for tunnel design, HV cable accommodation and substation design, ATT, Tokyo Electric Power Services Co. (TEPSCO), Electricite’ de France (EDF). Provided the engineering services and construction supervisions consist of:
• Tunneling Work
• Cable Installation
• Construction of Chidlom Terminal Building
• Installation of Substation equipment & Transformer