PROJECT NAME : PMC for Bang Pakong Terminal Phase 3
Owner : WP Energy Public Co., Ltd. (WP)
Client : WP Energy Public Co., Ltd. (WP)
Period of Services : 2019-2020
Location : Bang Pakong Terminal, Chachoengsao, Thailand
Project Cost : Approx. 600 Million Baht
Scope of Services and Description of Duties : ATT provided project management and construction supervision for Bang Pakong Terminal Phase 3 project. The major components of the project are:
• Site Demolition and Site Preparation
• Security and Protection system of Gas Pipe Line
• LPG Spherical Tank 6,000 Cu.m. 3 Tanks
• LPG Spherical Tank 1,000 Cu.m. 1 Tanks
• Product pipeline in the tank farm and terminal area
• Tank truck loading rack
• Pump House
• Communication system
• Fire fighting system
• Lightening Protection
• Building
• Utility and facility systems