PROJECT NAME : EIG/VSA Foundation
Owner : Air Liquide (Thailand) Ltd.
Client : Air Liquide (Thailand) Ltd.
Location : Laem Chabang Industrial Estate Sriracha, Chonburi Province, Thailand
Period of Services : October 2001 – January 2002
Project Cost : 80 Miilion Baht
Scope of Services and Description of Duties :
ATT had engaged to provide the detailed design as below :
• Building structure EIG VSA foundation unit sizing 13 x 20 m.
• Mat foundation for CO2 Vacuum Pump sizing 2.2 x 6.2 m.
• Mat foundation for C40 Compressor sizing 2.9 x 6.7 m.
• Drainage system for EIG VSA foundation unit.