Home OIL & GAS INDUSTRIES Upgrading Works at Sriracha Oil Terminal

PROJECT NAME : Upgrading Works at Sriracha Oil Terminal

 

Owner : Petroleum Authority of Thailand (PTT)

Client : DORSCH Consult (Germany)

Location :  Sriracha Oil Terminal, Sriracha district, Chonburi province, Thailand

Period of Services :  1992 – 1993

Project Cost :  Approx. 400 Million Baht

Scope of Services and Description of Duties :

 

In association with DORSCH Consult, ATT provided detailed engineering design, cost estimation, tender document preparation and construction supervision of the following marine facilities for PTT Oil Terminal in Sriracha district:

 

• Seaberth for 20,000 to 80,000 DWT Tankers

 

• 16.5 x 28.5 m., two-storey operation platform to accommodate 6 loading arms, office, 24″, 18″ and 8″ submarine pipelines, pig launcher, fire protection system, ship access tower, etc.

• 100 and 150 ton mooring dolphins with quick released hooks

• Breasting dolphins

• 800 m. of 24″, 18″ and 8″ submarine pipelines

• 1.20 km of 24″, 18″ and 8″ onshore pipelines through ESSO Refinery area and PTT Oil Terminal area

• Cathodic protection for piling system and steel structures

 

• Jetty for 1,000 to 6,000 DWT Tankers

 

• 9 x 14 m. operation platform to accommodate 6 loading arms and piping system

• 100 ton and 60 ton mooring dolphins

• Strengthen 800 m. of access bridge

• Cathodic protection system

• Fire protection system